Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation
2596doc091809
2-29
2
10.
Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the
bracket provided on the rear/loading-side outrigger guide. Reel in the winch cable.
Remove the winch handle.
11.
Place both fenders in the slots located behind the trailer tires. Raise all but the very front
outrigger.
DANGER!
Check to be sure the saw head is resting firmly
on the rest pin and mast rail stops and that the safety chain
is secured before towing the sawmill.
DANGER!
Never tow the sawmill without all guards and
covers in place and secured.
Be sure the blade housing and pulley covers are in place
and secure. Use the safety retainer pin and cable to fasten
blade housing covers.
See the trailer operator’s manual for specific information regarding hitch operation and
towing the sawmill.
Summary of Contents for 1996 LT25
Page 6: ......
Page 19: ......
Page 20: ...Safety General Information Components 1 1 12 2596doc091809 Safety General Information...
Page 50: ...Setup Operation Preparing The Sawmill For Towing 2 2 30 2596doc091809 Setup Operation...
Page 64: ......
Page 66: ......
Page 76: ......