Setup & Operation
Portable Sawmill Setup
Setup & Operation
2596doc091809
2-5
2
3.
Unhook the carriage safety chain.
4.
Turn the key switch on the control panel to the ACC position to enable the battery-oper-
ated accessories. Use the up/down switch on the control panel to raise the cutting head
from the carriage rest pin. Remove the locking pin and swing the rest pin down below bed
level.
5.
Use the feed handle to move the cutting head toward the front end of the mill. Lower and
set the remaining rear outriggers.
6.
Level the sawmill by adjusting the outriggers to raise or lower each end of the sawmill.
Adjust all outriggers evenly to avoid twisting the mill frame by jacking one outrigger higher
than the others.
For FAO(s), fine tune the outrigger base height as necessary. Move the cutting head to
the opposite end of the mill from the outrigger. Raise the entire outrigger (to remove the
sawmill weight from it) and adjust the outrigger base as necessary. Lower the entire out-
rigger and use the locking pin to secure in position.
CAUTION!
Do not adjust the FAO outrigger base height
while there is weight on the FAO. Damage to the FAO may
result.
FIG. 2-3. BASE HEIGHT ADJUSTMENT (FOR FINE ADJUST OUTRIGGER ONLY).
SM0213
FAO Base
Height Adjustment Nut
Locking Pin
Provided
Adjustment Wrench
Existing
Outrigger Guide
Summary of Contents for 1996 LT25
Page 6: ......
Page 19: ......
Page 20: ...Safety General Information Components 1 1 12 2596doc091809 Safety General Information...
Page 50: ...Setup Operation Preparing The Sawmill For Towing 2 2 30 2596doc091809 Setup Operation...
Page 64: ......
Page 66: ......
Page 76: ......