![Wolf CGB-2 Series Installation Instructions For Contractors Download Page 83](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733083.webp)
3064810_201804
83
37. Technical information, air/flue gas
routing
Notify your local flue gas inspector prior to installation.
16
22
11
4
5
4
2
26
10
4
8
1
C33x
4
>20
>30
5
C93x balanced flue
in a duct DN80
C33x balanced flue
in a duct DN80/125
B33 open flue
in a duct DN80
C93x balanced flue system
DN80/185 horizontal and DN80 vertical
Connection to a concentric balanced flue inside a duct (examples) DN80/125, C33x
Connection to a flue inside a duct, C93x
1 Gas condensing boiler
2 Adaptor DN60/100 to DN80/125
4 Balanced flue pipe DN80/125
500 mm
1000 mm
2000 mm
5 Spacer bracket
8 Separator
(slide coupling) if required
10 Inspection bend 87° DN 80/125
11 Support bend 87° DN80/125
16 Pipe collar
22 Support rail
26 Duct cover
with
UV resistant terminal
Summary of Contents for CGB-2 Series
Page 104: ...104 3064810_201804 46 Notes ...
Page 105: ...3064810_201804 105 46 Notes ...
Page 106: ...106 3064810_201804 46 Notes ...