![Wolf CGB-2 Series Installation Instructions For Contractors Download Page 78](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733078.webp)
78
3064810_201804
37. Technical information, air/flue gas
routing
Connection to a moisture-resistant flue system and balanced flue chimney
Plewa System
C43x
Schiedel System
C43x
10
10
10
10
1 Gas condensing boiler
2 Balanced flue pipe
with inspection port
(250 mm long)
4 Balanced flue
DN60/100
500 mm
1000 mm
2000 mm
9 Inspection bend
10 Bend 87° DN60/100
11 Pipe collar
12 Support rail
13 Support bend 87°
DN60 to DN80
14 Spacer
15 PP flue pipe DN80
500 mm
1000 mm
2000 mm
16 Duct cover
with UV resistant ter-
minal
17 Spacer bracket
18 Balanced flue
horizontal, with wind
protector
19 Connection to flue gas
chimney B33
Length 250 mm with air
apertures
17
18
18
11
11
11
11
19
4
160
160
>400
2
10
4
4
17
17
9
9
12
13
14
16
15
1
1
1
Horizontal balanced flue/connection to balanced flue chimney (examples) system DN60/100
C13x
C13x
B33
Dormer
Summary of Contents for CGB-2 Series
Page 104: ...104 3064810_201804 46 Notes ...
Page 105: ...3064810_201804 105 46 Notes ...
Page 106: ...106 3064810_201804 46 Notes ...