![Wolf CGB-2 Series Installation Instructions For Contractors Download Page 15](http://html.mh-extra.com/html/wolf/cgb-2-series/cgb-2-series_installation-instructions-for-contractors_991733015.webp)
3064810_201804
15
8. Standards and regulations
Observe all standards and guidelines applicable to the installation and opera
-
tion of this heating system in your country.
Observe the information on the boiler type plate.
The following local regulations must be complied with during installation and
operation of the heating system:
• Siting conditions
• Ventilation and exhaust air facilities and connection to a chimney
• Electrical connection to the power supply
• Technical regulations of the gas supply utility company regarding the connection of
the gas appliance to the local gas mains
• Regulations and standards regarding the safety equipment of the water heating
system
• DHW installation
Summary of Contents for CGB-2 Series
Page 104: ...104 3064810_201804 46 Notes ...
Page 105: ...3064810_201804 105 46 Notes ...
Page 106: ...106 3064810_201804 46 Notes ...