37. Technical information, air/flue gas
routing
11
12
13
4
14
4
17
9
16
3
4
1
Balanced flue inside a duct with horizontal connecting pipe DN60/100
Flue gas < 110 °C
Installation example for bal
-
anced flue/duct
C33x
Install horizontal
pipe with > 3°
slope towards
boiler
Please
note
1 Gas condensing boiler
3 Separator
(slide coupling)
if required
4 Balanced flue DN60/100
500 mm
1000 mm
2000 mm
9 Inspection bend
11 Pipe collar
12 Support rail
13 Support bend 87° DN60/100
14 Spacer
16 Duct cover
with
UV resistant terminal
17 Spacer bracket