EN
W415-2968 / B / 04.30.21
13
appliance pre-installation
4.2
collector box installation
IMPORTANT:
It is recommended to install ALL vent heat shield(s) before refi tting the front (and, where
applicable, rear) frame for ease of access. It is critical that ALL 4 knockout plates, ALL 4
cover plates are removed and BOTH (2) collector boxes are installed.
Type 1
!
WARNING
•
Before framing your appliance
or deciding on fi nal location,
determine vent requirements.
Also, see appliance manual for
vent shield installation, nailing
tabs installation, electrical
installation, gas installation, etc.
Appliance illustrated
for clarity purposes.
1. Attach the ducting to the
collector boxes plate using the
screws provided.
2. Reinstall front frame (and rear
frame for see-thru).
4.2.1 ducting installation to collector box
Secure collector boxes to the
appliance using screws provided.
Screw locations
vary by model size
x 6 per collector box
note:
The collector boxes
MUST
completely cover
the
knockout/cover plate openings.
note:
With the appliance in place,
it is best to install appliance
venting before adding the vent
shield and collector boxes.