3.2
Installing the overspeed governor
in the machine room
Always pay attention to the overspeed
governor rotational direction during each
stage of installation.
Preparation
The overspeed governor can either be installed
directly on the machine room floor or on a support
structure.
Lifts complying with EN-81 require the
rope aperture to be kept as small as possi-
ble and to be fitted with a 50 mm high col-
lar. A corresponding safety collar must be fastened
to the floor before installation takes place.
If a cement floor is to be poured over the
concrete after installation, bear this in
mind when fitting the collar.
Installation procedure
Always pay attention to the overspeed
governor rotational direction during each
stage of installation.
(
1
) If a supporting base is being used, it must be
screwed to the overspeed governor.
(
2
) Position the overspeed governor (with or
without base) and align the plumb line over
the centre of the safety gear
(
3
) Mark the drill holes and put the stud anchor in
place (stud anchors are delivered with sup-
porting base)
(
4
) Fasten down the overspeed governor (with or
without supporting base)
Take care of tightening torque
Screw M10: 46Nm
Screw M12: 80Nm
Änderungen vorbehalten!
Subject to change without notice!
Overspeed Governor
OL35E-NA
Operating instructions
Blatt/
sheet PM.7.002374.009
Datum/
date
08.04.2011
Stand/
version
08.04.2011
Geprüft/
approved WAT/MZE
Safety collar
Concrete
Shaft ceiling
(
1
)
(
3-4
)
(
2
)
Screw M12x40
Stud anchor: M10 or M12
(depending on base deliv-
ered)