Änderungen vorbehalten!
Subject to change without notice!
Overspeed Governor
OL35E-NA
Operating instructions
Blatt/
sheet PM.7.002374.011
Datum/
date
08.04.2011
Stand/
version
08.04.2011
Geprüft/
approved WAT/MZE
The contact is adjusted and sealed in the
factory. It is not allowed to be adjusted on
site.
(
1
) Connect the contact
(
2
) Test the contact function
The contact plate and the detent pin must
be put back to the initial position after
being manually tested.
Overspeed contact
-
use category:
AC 15, B300,
U
e
/I
e
240V (1,5A)
-
thermal current:
I
the
= 5A
-
insulation voltage:
U
i
= 250V AC
-
protection type:
IP 43
-
approved in accordance: VDE 0660 T100
IEC/EN 60947-5-1
(
1,2
)
3.4
Overspeed contact
Work involving electrical equipment
should only be carried out by an electrical
fitter or qualified personnel.
Before carrying out work, switch off all
voltage to installation equipment.
Take note of the following when laying the
connection cable:
• that the single polarity cables have dou-
ble insulation
• the use and laying of cables is governed
by the EMC
The overspeed contact opens the lift instal-
lation’s remotely controlled safety circuit.
Contact plate
Overspeed contact