RP
50
XD MK2
OPERATIONAL AND SAFETY
REQUIREMENTS
PRE-DELIVERY
1.1
Drive coupling alignments, pan and star meshing of pan rack and drive gear.
1.2
Operating clearances star blade to pan. Fixed blade to pan wall.
1.3
Correct oil level in gearboxes. All grease points charged. Gear teeth greased.
1.4
No load test. Correct rotations.
PRE INSTALLATION
2.1
Check consignment.
2.2
Offload equipment using certified lifting gear of suitable capacity, by a competent
person (see separate chart for nett weight).
INSTALLATION
3.1
Refer to contract arrangement and site instructions.
3.2
Mixer to be mounted on supports of adequate strength and rigidity to prevent undue
vibration when mixing and securely bolted.
3.3
Mixer frame to be level on structure, add packers as required.
3.4
Check that pan is correctly seated and that pan rack and drive gear are in correct
mesh.
ELECTRICAL SERVICES
4.1
Refer to wiring diagram in Ops Manual. All wiring to be undertaken by competant
electrician, it is recommended that the mains electrical supply is provided via an earth
leakage circuit breaker.
NOTE:
electrical cables particularly those with copper
conductors suffer from a condition known as ‘relaxation’ which may cause wiring to
work loose over a period of time, it is recommended that the tightness of wiring
connections and terminals are checked following the first month in service.
Summary of Contents for CUMFLOW RP50XD MK2
Page 4: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP50XD MK2...
Page 12: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS...
Page 20: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE...
Page 27: ...LUBRICATION CHART...
Page 28: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS...
Page 29: ...RP50XD MK2 MIXING PAN DRIVE...
Page 32: ...RP50XD MK2 STAR DRIVE ASSEMBLY ASSEMBLED LENGTH OF COUPLING ITEM 3 ON SHAFTS IS 73MM...
Page 36: ...RP50XD MK2 MIXING STAR ASSEMBLY...
Page 38: ...RP50XD MK2 MIXING STAR LIFTING ARRANGEMENT...
Page 40: ...RP50XD MK2 COVERS GUARDS...
Page 43: ...PAGE INTENTIONALLY BLANK...
Page 47: ...RP50XD MK2 DECALS AND LOGOS CROKER CUMFLOW RP50XD 1 2 4 5 6 7 8 9 10 11 12 13...
Page 49: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS...
Page 50: ...RP50XD MK2 FOUR WHEEL PAN TROLLEY...
Page 53: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM...
Page 55: ...Electrical Control Circuits dwg 11 03 02 10 55 09 Scaled to fit...
Page 56: ...V06302 dwg 11 12 02 07 03 44 Scaled to fit...
Page 57: ......
Page 58: ...Electrical Power Circuits dwg 11 03 02 10 58 17 Scaled to fit...
Page 59: ...V06303 dwg 11 12 02 07 04 45 Scaled to fit...
Page 60: ......
Page 61: ...General details of Control Panel dwg 11 03 02 11 01 09 Scaled to fit...
Page 62: ...V06301 dwg 11 12 02 07 02 37 Scaled to fit...
Page 63: ......
Page 64: ...Material Parts List dwg 11 03 02 11 03 32 Scaled to fit...
Page 65: ...V063PL1 dwg 11 12 02 07 01 06 Scaled to fit...
Page 66: ......
Page 67: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS...