Marine Installation Manual
2021-08
5
List of Changes
X72DF
Revision:
02
Date of issue:
2018-11
Location of change
Subject
1.1 Power/speed range
Figure 1-1 updated
1.2 Primary engine data
Table 1-1: guide feed rate of cylinder oil stated more precisely
1.4 Fuel operating modes
Paragraph and illustration added
1.5.1 Torque/power meter requirement
Table 1-4 updated
2.1 Pressure and temperature ranges
Paragraph rewritten and link name updated
2.2 Engine rating field and power range
Whole section updated and restructured
2.5 Electrical power requirement
Table 2-4: el. power requirement for UNIC-ECS updated; data for pilot fuel pump added
3.1 Dimensions and masses
Table 3-2: mass for connecting rod corrected
3.1.1 Dismantling heights for piston and cylinder liner
Links to external documents added
3.2 Engine outline views
Links to external documents added
3.3.1 Drawings
Paragraph rewritten
3.10 Fire protection
Table 3-4: table head rewritten for clarification
4.1 Twin-engine installation
Section restructured; more detailed information added
4.2 Cooling water system
Whole section updated and restructured
4.3.1 Lubricating oil requirements
Link to external document: document name and link name updated
4.3.5 Cylinder lubricating oil system
Alternatives to finished cylinder oils
Changeover between cylinder lubricating oils
Electrical trace heating for system side cylinder LO piping
Section structure changed
Link to external document: document name and link name updated
Information on iCAT updated
Whole section updated with more detailed information
4.3.7 Drain tank
Inclination angles
Tables 4-4, 4-5, 4-6 updated
4.4.1 Fuel oil system components
Diesel oil cooler
Table: formula corrected
4.4.4 Fuel oil treatment
Centrifugal fuel oil separators
Example for throughput capacity calculation corrected
4.4.6 Fuel oil specification
Paragraph updated
4.6.3 Gas specifications
Table 4-11 updated
4.11.1 Pipe connections
Links to external documents added
5.4.2 Recommended manoeuvring characteristics
FPP manoeuvring steps and warm-up times
CPP manoeuvring steps and warm-up times
Paragraph reworded for clarification
Table 5-2: table caption changed
Paragraph reworded for clarification
Table 5-3: table caption changed
5.6.2 Signal processing
Link to external document changed
6.7 Countermeasures for dynamic effects
New link to external document replaces former tables 6-1 & 6-2
7.1.2 Selective catalytic reduction
Low-pressure SCR
Figure 7-2 changed
9 Appendix
9.2 List of acronyms
Restructured
Updated