Marine Installation Manual
2021-08
xi
List of Figures
X72DF
27 An LNG sub-cooler within an integrated tank
. . . . . . . . . . . . . . . . . . . . . 4-46
28 Design fuel gas supply pressure requirements
. . . . . . . . . . . . . . . . . . . 4-48
29 Fuel gas supply pressure control at the engine inlet (engines
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-50
30 Fuel gas supply pressure control at the GVU inlet (engines
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-51
31 Fuel gas pressure level definitions
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-51
32 Fuel gas supply system with the iGPR
. . . . . . . . . . . . . . . . . . . . . . . . . . 4-52
from Wärtsilä
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-54
™
from Wärtsilä
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-55
35 Gas leak test sequence (engines with iGPR)
. . . . . . . . . . . . . . . . . . . . . 4-60
36 Gas leak test sequence (engines with GVU)
. . . . . . . . . . . . . . . . . . . . . . 4-60
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-61
38 Pilot fuel high-pressure system
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-62
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-64
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-67
41 Mesh size difference between absolute and nominal
. . . . . . . . . . . . . . . 4-70
42 Fuel oil filter arrangement ‘A’
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-71
43 Fuel oil filter arrangement ‘B’
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-75
—
Arrangement with only MDO/MGO or MGO
. . . . . . . 4-76
45 Fuel oil viscosity-temperature diagram
. . . . . . . . . . . . . . . . . . . . . . . . . . 4-81
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-82
47 Design proposal of WinGD’s sludge oil trap
. . . . . . . . . . . . . . . . . . . . . . 4-87
48 Design proposal of a manually bottom-drained sludge oil trap
. . . . . . 4-88
49 Design proposal of an automatically bottom-drained sludge oil trap
. 4-90
50 Arrangement of automatic water drain
. . . . . . . . . . . . . . . . . . . . . . . . . . 4-91
51 Determination of exhaust pipe diameter
. . . . . . . . . . . . . . . . . . . . . . . . . 4-92
52 Ventilation system arrangement 1 — Engine room ventilation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-95
53 Ventilation system arrangement 2 — Direct engine ventilation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-96