Commisioning
____________________________________________________________________________
15
7)
8)
d) If the actuators were open, they will automatically close after 2 minutes.
9)
10)
d) The Smoke trip has priority.
Function
description
Operating elements and fuse review
wiring diagram
Automatic detectors
Emergency power supply test
Aktivation of internal check
Wind/rain detector
a) Spray test aerosol on the detectors.
b) The actuators move open through to the end position. The red LED in the detector, the red alarm LED (also
in the control unit) and the permanent acoustic signal in the operating panel are ON.
c) While running, press the Closed button at the ventilation button, then press both buttons, the actuators
must neither close nor stop!
d) Press the reset/Closed button in the operating panel. The actuators close through to the end position. The
ventilation function is released again. The red alarm LED (also in the control unit) and the signal generator
are OFF.
a) Remove the mains fuse from the control centre. Adhere to the relevant regulations!
b) The green mains and operating LED's are OFF, the yellow accumulator Led is flashing (control unit in the
accumulator mode).
The malfunction message at the break glass unit is ON.
c) The ventilation buttons are deactivated.
e) Test the SHE trip and reset/closed as described under 5).
f)
Refit the mains fuse.
g) The green mains and operating LED's are ON, the yellow accumulator LED is OFF. The malfunction
message at the break glass units is OFF.
a) Disconnect the smoke vent unit from the mains and back-up batteries
b) Exchange the blind jumper J2 for active jumper J1
c) Reconnect the smoke vent unit to the mains and back-up batteries
d) The operation LED flashes app. 10 seconds to control the activation
a) Open the actuators with the ventilation button.
b) Wet the rain sensor, the actuators will fully close, the green wind/rain LED in the control centre is ON.
c) While running, press the Open button at the ventilation button, then press both buttons, the actuators must
neither open nor stop!
When the start-up was successful, then close the doors of the break glass units and of the control unit.
If the start-up was unsuccessful (error with one of the test run processes), please refer to the chapter
and
. If necessary, check the wiring in accordance with the
.