en
Installation and electrical connection
20
WILO SE 2021-05
9. Clean the filler hole screw plug, replace the seal ring and screw it back in.
Max.
tightening torque: 8 Nm (5.9 ft·lb)!
10.Restore corrosion protection: Seal screw plug, e.g. with Sikaflex.
6.4.2
Installation with lowering device
The mixer is lowered into the basin using a lowering device. The lowering device’s guide
pipe safely guides the mixer to the duty point. The resultant reaction forces are trans-
ferred directly into the foundation via the lowering device. The foundation
must
be de-
signed to bear this load!
CAUTION! Material damage due to incorrect accessories! Due to the high reaction
forces, the mixer may only be operated with the manufacturer’s accessories (lower-
ing device and frame). If the mixer is ordered for installation with a lowering device,
the frame comes pre-assembled. If the mixer is delivered without a frame, order the
appropriate frame from customer service!
Preparatory tasks
1
2
3
4
5
6
7
8
Fig. 4: Prepare the mixer
1
Hoisting gear
2
Lifting equipment
3
Shackle for attachment
4
Propeller
5
Platform for secure set-down
6
Supporting block for alignment
7
Frame
8
Cable brackets for strain relief
‡
Mixer set down and horizontal.
‡
Frame mounted on the mixer.
‡
Lowering device mounted in basin.
‡
Hoisting gear with sufficient bearing capacity is available.
1. Attach lifting equipment to frame with a shackle.
2. Mount the propeller. See separate installation instructions “Blade installation”.
3. Version with plastic rollers: Loosen linchpins and dismantle plastic rollers and
quick-release axles.
NOTICE! Prepare components for further installation.
4. Lay all connection cables.
5. Mount the cable bracket for the cable anchoring on the edge of the basin.
CAUTION! In case of powerful flows in the basin, install the “additional rope an-
choring”!