10
/17
Williams-Sonoma Inc.
Assembly Instructions
Instructions d’assemblage
Instrucciones de Ensamblaje
Pottery Barn
–
Pottery Barn Teen
–
Pottery Barn Kids
–
Williams Sonoma Home
–
West Elm
–
Rejuvenation
–
Mark and Graham
Un-install the Ceiling Plate (E) from the marked ceiling location by loosening and removing the 2 J-box Mounting Screws (J) with a
screwdriver. Using the drill with the appropriate size drill bit (just large enough to make hole that will allow passage of the folded wings of
each Toggle Bolt (N) assembly), drill 1 hole in the ceiling at each of the 4 marked hole locations for the Toggle Bolts (N). Use the
assembled Toggle Bolts (N) with the upper Toggle Flat Washers and Toggle Nuts (D) & without the Metal Balls, inserted through each of
the 4 ceiling holes, making sure the Toggle Bolts(N) are fully inserted into the ceiling and the toggle wings are open. Rotate the upper nut
on each installed Toggle Bolt (N) in a clockwise direction until the washer and nut are tight against the ceiling. Make sure enough of the
exposed threaded rod of each Toggle Bolt (N) is of sufficient length to be able to secure the Ceiling Plate (E) to the ceiling using the 4
Metal Balls. Some adjustment of the threaded rod and nut may be needed to ensure enough of the Toggle Bolt (N) threaded rod length is
exposed below the ceiling line to fully engage and tighten the 4 Metal Balls against the Ceiling Plate (E), but not too long to interfere with
the upper side of the Canopy (F).
NOTE: The Toggle Bolts (N) must be securely fastened to the ceiling. Then the Ceiling Plate(E) installed up against
the ceiling, first secured by the 2 J-box Mounting Screws (J) and then finally the 4 Metal Balls installed over the
exposed threaded rods! The rods must not spin in place when the Metal Balls are tightened!
Attach the Ceiling Plate (E) to the ceiling outlet box using the 2 J-box Mounting Screws (J). Align the slots of the Ceiling
Plate (E) with the two threaded holes located on the J-Box taking care to also align the 4 holes on the Ceiling Plate with the
installed Toggle Bolts (N). Use a screwdriver to tighten each screw with a screwdriver until the Ceiling Plate (E) is firmly
secured to the J-Box. Secure the Ceiling Plate (E) to the drywall ceiling using the 4 Metal Balls against the Ceiling Plate (E)
turning each clockwise until tight.