PAGE 39 OF 102
INFLEXION PLUS
OPERATING INSTRUCTIONS
TP-5211901-C
JUNE 2021
Figure 5-6 HHRC Holder
5.6.2
Panel Mount Remote Control (PMRC)
If your system was not ordered with the optional PMRC, go to section 5.7.
The PMRC should be located where the operator has line-of-sight to the mast operating space.
The PMRC should be located in a protected, dry location (the PMRC is IP54). To attach the
PMRC:
1. Cut the panel according to the dimensions shown in Figure 5-7.
2. The screws are provided by the installer. #10 stainless steel screws are recommended with
an installation torque of 20-24 in.-lb. (2.2-2.7 Nm).
3. Place the PMRC through the panel cutout and secure with screws.
Summary of Contents for Inflexion Plus 1.8
Page 2: ......
Page 6: ...PAGE 4 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 16: ...PAGE 14 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 30: ...PAGE 28 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 50: ...PAGE 48 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 62: ...PAGE 60 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 80: ...PAGE 78 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 81: ...PAGE 79 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 82: ...PAGE 80 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 94: ...PAGE 92 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 96: ...PAGE 94 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...
Page 100: ...PAGE 98 OF 102 INFLEXION PLUS OPERATING INSTRUCTIONS TP 5211901 C JUNE 2021 ...