59
8 Setup
WIKA Operating Instructions - Differential pressure transmitter DPT-10
8 Setup
8.1 General instructions
Before adjusting DPT10, you have to clean the effective pressure
lines and the instrument must be filled with the medium.
DPT10 with double chemical seal is immediately ready for operation.
The DPT10 without chemical seal or with single chemical seal is
ready for operation after opening a blocking valve, in case one is
present.
8.2 Flow measurement
+
–
I
II
+
6
7
3
2
4
Fig. 46: Prefered measurement setup for gases, connection via 3-fold valve
block, flanging on both sides
I DPT10
II 3-fold valve block
2, 4 Inlet valves
3 Breather valve
6, 7 Vent valves on DPT10
Gases