Glass and Material Lift
GML 800+
41
Operating Manual
GML 800+
Operate
the lift on firm and level ground only. Perform a PRE-OPERATION function test and convert the lift to
the operating position as described in the section headed “Installation “.
Ensure that all safety brakes on the swivel casters are engaged when working with a load.
24V Powerpack Electric Winch
1.
Center the load on the loading accessory and
secure it against toppling.
2.
Ensure that the battery wagon is converted
to its operating position as described in the
section heading
INSTALLATION GML /K DC
.
3.
Connect the plug and the coupling of the
battery wagon and winch in order to supply the
winch with energy.
4.
Inspect the status of the battery charge by
looking at the voltmeter display (a target of:
23V). If the charging status is less than 23
Volts, charge the batteries prior to the operation
of the lift. If the charging current is too low
then the mast system will not be able to reach
its full extension.
5.
To
switch on
the winch, insert the key into
the key switch 8) and turn it TO THE LEFT. When
the green signal lamp 4) is on, the winch is
ready to be operated.
6.
Raise
the load by turning the rotary switch
on the cable control 1) to the upwards switch
setting FOR RAISING 2). As soon as the rotary
switch is released the winch will automatically
stop.
7.
Lower
the load by turning the rotary switch
on the cable control 1) to the downwards
switch setting FOR LOWERING 2). As soon as
the rotary switch is released the winch will
automatically stop.
8.
To
switch off
the winch return the key in
the key switch back to a vertical position. The
green signal lamp will go off if the current is
turned off.
IMPORTANT!
The lift has two automatic limit switches that
deactivate the rotary switch of the control
system and automatically stops the winch
immediately when the loading accessory has
either reached its lowest position (when
LOWERING) or its highest position (when
RAISING).
Emergency release:
If the lift is malfunctioning it is crucial that the
electric emergency release is deployed. It
automatically lowers the loading accessory and
activates the red signal lamp 5). If there is a
malfunction the winch and cable control system
will not operate due to safety requirements. Call
a service technician!
a)
Right side
b) Left side
c) Underneath
c) Cable Control
1
2
3
4
Emergency
Stop
10)
Supply line to automatic limit switch
11)
Emergency release
12)
Supply line to winch
6
1)
Supply line to battery wagon
2)
Fuse
3)
Operating hours counter
reader
4)
Signal lamp GREEN
(operational readiness)
5)
Signal lamp RED
(malfunction)
6)
24 V Accessory port
(electric. crane outrigger)
7)
Emergency stop switch
8)
Key switch
(On/Off)
9)
Supply line to the Cable control
1)
Rotary switch Raising/Lowering
2)
Switch setting RAISING
3)
Switch setting LOWERING
4)
Accessory Button
(electric. Crane outrigger)
5)
Emergency stop switch
6)
Supply line to winch control system
Raising and Lowering with an DC-Electric Winch.
Operating the electric winch on DC-Models (24V).
Stop
10
11
12
5