Glass and Material Lift
GML 800+
31
Operating Manual
GML 800+
Installation GML/K
Conversion from operating position GML/Std.
Set up the lift on firm and level ground only.
Ensure that all caster safety brakes on the chassis are engaged during set up.
Securing the
outrigger:
Rear installation of
the outrigger:
c)
1.
Remove the socket pin (a) completely from
the chassis.
2.
Loosen the nut and bolt (b) that attach the
outrigger to the chassis. Remove the bolt
completely. Keep the nut and bolt within
easy reach.
3.
Hold the outrigger firmly and remove it
completely from the chassis.
4.
Position the outrigger at the rear of the
chassis. Secure the outrigger by inserting
the bolt in slot (c) in the chassis and lock it
in place by tightening the nut.
Filling the
weight box:
5.
Place the socket pin in the upper slot (c)
beside the bolt (d).
6.
Repeat steps 1 - 5 for the second outrigger.
7.
Position the weight box (1) on the receptors
on both outriggers (e).
8.
Secure the weight box with the socket pins
(2) on both sides and engage the safety ring
on the locking bolts.
9.
Completely fill the weight box with the
counterweights. Stack the counterweights
flatly, one on top of the other, 6 x 16 kg on
each side of the weight box.
WARNING:
Only use lift specific counterweights!
WARNING:
1.
NEVER operate the GML/K unless the weight box is completely filled!
2.
Never operate the lift with only one outrigger!
3.
Both outriggers must be pointing in the same direction! Otherwise the lift must not be operated!
4.
Never move the lift with a raised load! Only allow for minor position changes.
5.
Avoid sudden movements.
Securing the
outrigger:
GML/Std
Operating position:
Installing the
weight box: