4 Switch Installation
28
Wieland Electric GmbH | BA001047 (Rev. A) | 06/2018
2.
Remove the terminal block from the Switch.
3.
Insert a small flat-bladed screwdriver in the V1+/V1- wire-clamp screws, and loosen the
screws.
4.
Insert the negative/positive DC wires into the V+/V- terminals of PW1. If setting up power
redundancy, connect PW2 in the same manner.
5.
Tighten the wire-clamp screws to secure the DC wires in place.
Figure 4.11 Removing a Terminal Block
Figure 4.12 Installing DC Wires in a Terminal Block
Loosening Wire-clamp Screws
Installing DC Wires
Securing Wire-clamp Screws
Figure 4.13 Installing DC Wires in a Terminal Block