4.4
Wieland Electric | BA000349 | 05.2007
Electrical Installation
| 4
5. Screw in the penetrating screws.
• Screw all penetrating screws into the flat cable.
• Torque: 1 Nm
Conductor assignment
1
L1
2
L2
3
L3
4
N
5
+
6
-
PE
PE
6. If disconnected: Reinsert the electrical plug connections between hood and base.
7. Fasten the hood with the four fastening screws.
• Ensure that the unit is tight and that no connecting cables have been pinched.
• The podis field distributor is connected to the energy bus.
4.3 Connection of sensor cables
The following sensors and actuators can be connected to the podis MOT FP C/CM/CP 2I2IO/
RS485 SEW via the M12 sockets X4 and X5:
• Inputs: 2-wire and 3-wire sensors, p-switching
• Outputs: Semiconductor, short-circuit-proof and overload-proof
Digital inputs and outputs
1 IO2 / IO3 (X4)
2 I0 / I1 (X5)
WARNING
Unused connections must be fitted with M12 caps to ensure enclosure IP65.
Assignment of
contact points
2
1
Screwing in the penetrating screws
Phillips no.1 screwdriver blade with a shaft length
of at least 45 mm
Summary of Contents for podis MOT FP C
Page 2: ......
Page 22: ...Wieland Electric BA000349 05 2007 podis MOT FP C CM CP I IO RS485 SEW Device Description 2...
Page 24: ...3 Wieland Electric BA000349 05 2007 Mechanical Installation Assembly 3...
Page 44: ...5 Wieland Electric BA000349 05 2007 Commissioning 5...
Page 46: ...6 Wieland Electric BA000349 05 2007 Operation 6...
Page 62: ...9 6 Wieland Electric BA000349 05 2007 Appendix 9...
Page 63: ......
Page 64: ......