7
6
Preparation of Main Components for Installation
Application
Ensure the correct pump type has been selected for the application; part numbers and
descriptions are included on each pump case.
Packing Case
Cases are delivered damage free and complete. Ensure the case has not been
damaged during storage or transport to rail site, should the case be broken the
contents should be carefully checked with reference to the contents list included
within each pump packing case. Dispose of all packaging responsibly.
Pump Unit
Visually inspect for any casting defects that will affect its operation.
Ensure that both the pump unit brackets are not damaged and that both bolts are
present on each bracket.
Ensure that each outlet non-return valve at the base of the pump body is fully
tightened into each pump body.
Ensure that there is one bleed screw in each pump body and that they are fully
tightened.
Ensure that each pump body has one grease outlet pipe attached.
Ensure that the plunger is able to be depressed manually and returns freely.
Blade
Ensure that it is not bent or damaged and all ports are free from blockages.
Ensure that all bolts are present and are fitted securely.
Ensure that the hose inlet tails, which the delivery hoses attach to, are in place and
are not damaged.
Clamps
Ensure that both pump and Blade clamps are not damaged.
Ensure that the threads on the clamp studs are not damaged.
Ensure that the threads on the hook bolts are not damaged.
Hoses
Ensure that the hoses are intact and free of holes and splits.
Reservoir
Visually inspect for any casting defects that will affect its operation.
Ensure that all bolts are present and are fitted tightly.
A non-return filling valve is fitted tightly and the internal ball is free moving.
Serial
Numbers
Pumps and Reservoirs are supplied with unique serial numbers, these should be
recorded prior to installation and recorded on installation record sheets as required