5-1
COMPONENT TESTING
Before testing any of the components, perform
the following checks:
• Control failure can be the result of corrosion
on connectors. Therefore, disconnecting and
reconnecting wires will be necessary through-
out test procedures.
• All tests/checks should be made with a VOM
or DVM having a sensitivity of 20,000 ohms-
per-volt DC, or greater.
• Check all connections before replacing com-
ponents, looking for broken or loose wires,
failed terminals, or wires not pressed into
connectors far enough.
• Resistance checks must be made with power
cord unplugged from outlet, and with wiring
harness or connectors disconnected.
• Unless stated otherwise, make all resis-
tance checks by disconnecting the compo-
nent connector at the electronic control.
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
PUSHBUTTON SWITCHES
Refer to page 4-2 for the procedure for servic-
ing the pushbutton switches.
1.
Unplug dryer or disconnect power.
1
3
2
4
6
2.
Disconnect the wires from the terminals of
the pushbutton switch you are testing.
3.
Set the ohmmeter to the R x 1 scale.
4.
Depending on the pushbutton switch ter-
minal configuration, touch the ohmmeter
test leads to the following switch termi-
nals. The meter should indicate either an
open (infinite), or a closed (0
Ω
) circuit.
Terminals 1 - 3
Terminals 2 - 4
Terminals 4 - 6
5.
Press the plunger, and the switch should
change states (from open to closed, or
closed to open).
Unused
Plunger
Summary of Contents for LEW0050PQ - Electric Dryer
Page 4: ... iv NOTES ...
Page 8: ...1 4 NOTES ...
Page 22: ...2 14 NOTES ...
Page 28: ...3 6 NOTES ...
Page 46: ...6 2 NOTES ...
Page 48: ...CORPORATION ...