P1 CONTROL COUNTER INSTALLATION
The
P1 control meter
provides a direct connection of the AC power cables of the existing PV system, in order to measure
the PV power produced. The input and output terminal blocks can accommodate cables with a section up to 6 mm2 and
a maximum current of 45A.
Pic.9 Installation scheme Counter P1
The P1 control meter can be installed inside existing panels with single 1U modular assembly, according to the diagram
in
Pic. 9
. The meter must be connected to the Leonardo PRO X, in the lower panel, to the Meter input, respecting the
polarity indicated. The connection is shown in
Pic.10
.
Pic.10 P1
Control BUS cable diagram at meter P1
2 POLES
CABLE
AC IN
Meter
Maximum length: 20m