LEONARDO PRO X 3000/48 Li
User Manual
EN
11
CONNECTIONS
Pic.12 Pannello di connessione del Leonardo PRO X
AC-IN: Connection to the grid AC input, 3x13mm
2
AC-OUT-1
–
EPS OUT: Connection of privileged loads (EPS), 3x13mm
2
BAT+/- : Battery connections, screws M8
Current Sense:
TA sensor for supplying loads, jack 3.5mm
VE-Bus: Internal Bus connection, RJ45 (Leonardo PRO X is supplied already connected to the VE-Bus port (8))
VE-Bus: Control Bus connection for the connection of a Leonardo PRO X Slave, RJ45
Meter:
Bus connection of the production counter P1, 2x2.5mm
2
VE-Bus:
Internal control bus connection, RJ45
WBUS: Connection of the WESTERN CO, RJ11 Bus (not used).
CAN:
CAN-BUS battery connection, RJ10
Ethernet:
Internet connection, RJ45
INVERTER WIRING
Make the electrical connections of the inverter, strictly following the following order:
1.
positive battery
cable
(3)
(see connection in the
DC side protection section
);
2.
negative battery
cable
(3);
3. connect the
CAN communication
cable
(10)
; (see
DC side protection section
)
4. connect the
Bus cable (7)
from the counter P1, through a polarized connector; (see
control BUS cable
diagram at counter P1
)
5. connect the
Ethernet PLUG (11)
to internet
6. connect the TA sensor connector properly installed (see
TA current sensor installation
)
7. put the
AC side protections on AC-IN and EPS-OUT in the OFF position
(see EXTERNAL PROTECTIONS
paragraph);
8. connect
AC-IN input (1)
on AC input connection;
9. connect the
EPS-OUT (2) output of the PRIVILEGED LOADS
to the AC Output connection.
2
1
3
8
7
9
10 11
4
5
6
1
2
3
4
5
6
7
8
9
10
11
Summary of Contents for Leonardo PRO X 3000/48 Li
Page 1: ...Leonardo PRO X 3000 48 Li Manuale utente User manual IT EN...
Page 2: ......
Page 52: ......