![Wenger Diva Acoustical Tower Installation Instructions Manual Download Page 8](http://html1.mh-extra.com/html/wenger/diva-acoustical-tower/diva-acoustical-tower_installation-instructions-manual_956645008.webp)
8
Tower Installation (continued)
Assemble the Center Panels
Refer to the installation drawings for center panel placement.
1. Sweep the floor around the assembly area and place the sheets of cardboard that shipped with the
tower onto the floor surface to protect the panel surfaces.
2. Place the center panels with the finished surface facing down onto the cardboard and remove the tape
holding any protective paper to the face of the panels.
3. Cut foam strips to span the entire width of each upper center panel and install it to be fully recessed into
the bottom edge of the panel.
Then trim each foam strip end to a 45° angle.
Upper Center
Panel
Lower Center
Panel
Sheets of
Cardboard
Foam strip
location
Cut foam strip
edges to 45°
angles
Foam Strip
Lower Filler
Panel
Handle
3/16"
Blind Rivets
Orient panel so part number
labels are at the bottom
4. Attach two handles to the lower filler panel using
3/16" blind rivets in each of the pilot holes.