![Wenger Diva Acoustical Tower Installation Instructions Manual Download Page 15](http://html1.mh-extra.com/html/wenger/diva-acoustical-tower/diva-acoustical-tower_installation-instructions-manual_956645015.webp)
15
Tower Installation (continued)
Attach Base (continued)
3. Attach the brace rods.
a. Slide a brace rod into the base and
then into the lower cross brace
as shown.
b. Attach the brace rod using one 1-8 hex jam nut
at each end.
Square the base to the tower while
tightening the hex jam nuts.
c. Repeat for the other brace rod on the
other side.
Brace
Rod
First, slide brace rod
through the base
Then through the
lower cross brace
1-8 Hex
Jam Nuts
1-8 hex
jam nuts
on
both sides
1-8 Hex
Jam Nuts
Square the base to
the frame while
tightening the nuts