![Wenger Diva Acoustical Tower Installation Instructions Manual Download Page 32](http://html1.mh-extra.com/html/wenger/diva-acoustical-tower/diva-acoustical-tower_installation-instructions-manual_956645032.webp)
32
Decals, Numbers and Logos
1. Place a tower operation decal onto the back side of a door panel or wing panel
(place one decal on each tower assembly) near the outer edge and with the bottom of the
decal about 54" (1372 mm) from the floor.
2. Mark the filler panels.
a. Place a lettered sticker as provided at the center of the filler panel.
b. Place a matching lettered sticker on the lower filler panel directly above the number on the filler panel.
c. Use a different letter on each tower.
Final Inspection
1. Make sure that all counterweights are in place.
2. Fully hand tighten the hex jam nuts on both base rods.
3. Make sure that there is no missing hardware or loose fasteners.
4. Inspect all tower panels for surface finish damage.
Touch up as required.
5. Make sure that the over-center latch on the filler panels works smoothly.
6. Make sure that all door closers, slide locks, wings, and wing locks operate smoothly.
7. Make sure that the tower is sturdy and that all casters and feet are touching the floor.
8. Set up and level the towers as required per the site conditions.