![Wenger Diva Acoustical Tower Installation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/wenger/diva-acoustical-tower/diva-acoustical-tower_installation-instructions-manual_956645023.webp)
23
Lifting Tower
Lift the tower assembly to stand upright.
1. Secure the lifting casters to both tower casters using locking clamps
(see photo 1 on the following page)
.
2. Fold up the wing panels on both sides.
Wrap a chain around the diagonal braces of the frame and connect it to the edge of the wing panel
using a hook, clamp and locking clamps
(see photo 2 on the following page)
.
3. Attach a span set sling around both ends of the lower cross brace.
Keeping the sling under the cross braces, run it to the top of the tower assembly
(see photos 3a and 3b on the following page)
.
4. Connect the end of the sling to a hoist and lift the tower assembly.
Tower Installation (continued)
Chain & Clamp
Location
Sling
Location
Chain & Clamp
Location
Clamp
Caster
Clamp
Caster
Do not remove the rigging hardware
until the counterweight plates have
been added.
!
WARNING