Installation
19
EN
2. First switch off MEDUMAT Easy again.
3. Then loosen the screw connection to the
cylinder.
Connecting the new cylinder
1. First briefly open and close the valve of the new
oxygen cylinder. This should blow out any particu-
late matter.
Keep the valve opening away from the body,
making sure that neither yourself nor other per-
sons can be injured by escaping particles.
2. Next use the fluted connecting nut to couple the
pressure reducer to the valve on the oxygen cyl-
inder. Tighten the connecting nut by hand.
3. If the pressure hose is not already connected to
the exit from the pressure reducer, make this
connection with the G 3/8 connecting nut.
4. Screw the other end of the pressure hose on to
pressure gas connection on the MEDUMAT Easy
if this has not yet been done.
5.2 Ventilation hose
1. Slide the pressure gauge tube onto connection.
2. Slide the ventilation hose onto connection.
Make sure that this does not cause any kinks in
the pressure gauge tube already connected. If
necessary, turn the ventilation hose while sliding
on as appropriate.
Summary of Contents for Emergency MEDUMAT Easy
Page 2: ...English 3 Espa ol 70 Portugu s 146...
Page 5: ...Overview 5 EN B 10 14 13 11 12 15 C 16 17 19 20 18 21 or...
Page 69: ......