7
Assembly
The screw hook may only be attached to suffi ciently solid materials, e.g. concrete.
Only use permitted dowels or supports for the ceiling system. Please make sure
that you always seek specialist advice if required!
Make sure that the screw hooks are cross-ways to the main direction of the swing,
i.e. when standing in front of the swing, you should be able to see through the “eye”
of the hook. This prevents premature wearing of the hook.
The maximum load bearing capacity of the ball swing is 100kg.
(Make sure that the 360° movement of the rotating swivel is not restricted.)
(The second clip and the rotating swivel are
not included)
Step-by-step assembly of the ball swing (1-point suspension):
1. Attaching the support strap.
2. Connecting the support strap and the rope using the clip and protective cover.
Pull the protective cover
over the metal parts and
fasten tightly.
3. Mounting the ball swing onto the suspension point (swivel).
The distance from the ground should be at least 35cm.
G-056889-schaukelball-produktinformation.indd 7
16.10.17 09:45