
9
2 INSTALLATION AND OPERATION
Before installation and use of the wheel balancer, you should carefully read this installation
and operation manual. And keep this manual in hand for reference at any time. You should be
sure that all the operators have read this manual to guarantee the most perfect functions of the
machine and meanwhile the safety.
2.1 PROTECTIVE HOOD INSTALLATION:
: shown in page 26~27
2.2 MAIN SHAFT INSTALLATION
MAINSHAFT INSTALLATION
:
Before installation, use the ethyl alcohol and compressed air
to clean up the center hole of the shaft and connect part. Use spanner and screw to fix the
thread shaft on the balance shaft (Fig2)
2.3 ELECTRICAL CONNECTION & EARTHING
According to the label on the connection between power cable and body, the power cable
connect socket must be grounded with the reliable earth wire.
All the electrical devices installation must be done by the qualified staff. Before installation,
please check
If the power system is comply with the technical parameter marked on the nameplate of the
machine.
The wiring of the machine must have the fuse and the perfect ground protection. And install
the electrical
Leakage automatic controls switch in the power source. And recommend the application of the
stabilizer if the voltage of installation site is unstable.
Any electrical connect in the workshop is only done by the qualified technical staffs and it
should meet the enforced regulation. .
Any electrical connect must be according to the following:
• Power on the data plate on the machine;
• Voltage decrease cannot exceed 4% of the rated voltage on the data plate when full load
Fig2
Summary of Contents for W-957-40
Page 1: ...1 ...
Page 38: ...38 APPENDIX 1 POWER DOARD LAYOUT ...
Page 39: ...39 APPENDIX 2 CIRCUIT SCHEME ...
Page 40: ...40 ...