Commissioning protocol IP 09
Soldos V3
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Inbetriebnahmeprotokoll IP\WDT IP 09 Soldos V3 EN FO 01.doc
Page 1 of 2
This protocol is to be completed by the commissioning technician! All warranty claims expire when no completed and
signed commissioning protocol is available!
Object: ...................................................................................................... Date: __.__.____
City, Street, Street number: ……………………………………………………………………………………………………………………………
Device type: .................................Year of construction: .....................
Serial no.: .....................................................
Activity
Completed Comment
1
Initial operation
1.1
Device checked for correct installation
1.2
Device and pipes checked for leaks
1.3
All materials in the steam room and the ventilation ducts are checked
on their corrosion resistance to 5% brine solution
1.4
Initial operation was performed according to operating instructions
Section 5.
1.5
The pipe length of the dosing line was stored in the software.
1.6
Disinfection according to operating instructions Section 5.2.1 was
performed.
1.7
Filling and starting of the brine nebuliser was performed according to
operating instructions Section 5.2.2
1.8
Control parameters were adapted and entered into the operating
data sheet in Section 9.4
1.9
All test programmes checked
1.10
Device checked for correct operation
2
Other
2.1
Operating instructions discussed and handed over
2.2
Operating and maintenance staff instructed
Other comments:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Commissioning and instruction performed: .............................................................................................................
Persons instructed: ………………………………………………………………………………………………………………………………..
Signature of commissioner: ......................................................................................................................................
Countersigned by operator: ….................................................................................................................................