
Weldco-Beales Manufacturing
Page 33
WBM
MSW102 SNOW WING
PARTS, SERVICE AND INSTALLATION
ASSEMBLY AND INSTALLATION
INSTALLATION INSPECTION
POSSIBLE
GROUNDING
POINT
FUSE BOX, ON LEFT SIDE OF
OPERATOR’S SEAT.
ii. Identify the optional work equipment wiring harness (labelled R4). The power
supply will connect to pin #2.
R4 WIRING HARNESS.
CONNECT ELECTRICAL
BOX POWER SUPPLY
TO PIN #2 ON THE
OPTIONAL WORK
EQUIPMENT WIRING
HARNESS.
R1 WIRING
HARNESS
iii. Route the snow wing electrical box power supply wiring harness to the
machine’s optional work equipment wiring harness (R4). Route wires through the
main wiring grommet in the floor of the motor grader cab.
iv. Remove the blanking plug from the optional equipment wiring harness (R4). and
connect the snow wing electrical box power supply wire to pin #2.
v. Route the snow wing electrical box ground wire to an existing grounding point.
There is a suitable grounding point in the fuse box in the cab.
ROUTE THE ELECTRICAL BOX
POWER SUPPLY THROUGH THE
MAIN WIRING GROMMET IN THE
CAB FLOOR.
Summary of Contents for KOMATSU GD655-6
Page 4: ...WBM Parts Service and Installation Manual MSW102 Snow Wing...
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......