
Weldco-Beales Manufacturing
Page 10
WBM
MSW102 SNOW WING
PARTS, SERVICE AND INSTALLATION
ASSEMBLY AND INSTALLATION
INSTALLATION, GENERAL INFORMATION
Installation
General Information
Read all of the Installation Instructions before beginning installation of unit.
For product support contact your dealer, Weldco-Beales Service Department or
Weldco-Beales Engineering Department.
All installation welds must be made in accordance with current CWB (Canadian
Welding Bureau) or AWS (American Welding Society) standards, by certified welders
using E-7018 electrodes or equivalent wire.
Torque all bolted connections and threaded hydraulic fitting or adapter connections
to the values listed in the appendix. Clean all threaded mounting holes with a tap or
thread chaser.
For complete installation instructions see the following pages.
The basic order of installation is:
1. Prepare grader for installation: lockout, move factory light and remove ladder.
2. Install front mount and lift-frame.
3. Install rear mount.
4. Install moldboard.
5. Install pushpole.
6. Install hydraulics.
7. Install electrical.
8. Do an installation inspection.
CAUTION
!
The grader must be parked in a level and open work area. Apply the parking brake before
beginning installation of the snow wing. Lockout the motor grader and tag it “as attachment
installation in progress”.
Summary of Contents for KOMATSU GD655-6
Page 4: ...WBM Parts Service and Installation Manual MSW102 Snow Wing...
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......