14
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
Tools Needed:
10
bottom Section
9
Center the bottom section in the door
opening. Level section using wooden
shims (if necessary) under the bottom
section.
WEAThER
SEAL
LEVEL
hEADER
Level
jAMB
BOTTOM
SECTION
WOODEN ShIMS
(If NECESSARy)
jAMB
Tape Measure
Pencil
Power Drill
9/32” Drill Bit
1/2” Drill Bit
1/4” Wrench
lift handle
NOTE:
Doors with a keyed lock do not require this lift
handle.
NOTE:
for door section identification see page 4.
Locate the inside center stile or the desired lift handle
location on the lock (2nd) section of the door. Position
the lower hole in the lift handle 4” from the bottom of
the second section.
IMPORTANT:
The lift handle and the step/lift plate
need to be vertically aligned.
Drill (2) 9/32” dia. holes through section. Enlarge the
holes from outside the door to 1/2” dia.
Assemble the outside and inside lift handle to the
section using (2) 1/4” x 2-1/2” carriage bolts,
( 2) 1/4”- 20 hex nuts and (2) spacers.
NOTE:
Do not drill through or enlarge holes on the
inside of the door.
LIfT hANDLE OuTSIDE
LIfT hANDLE INSIDE
LOCk
SECTION
LOCk
SECTION
LOCk
SECTION
BOTTOM
SECTION
BOTTOM
SECTION
BOTTOM SECTION
LIfT
hANDLE
LIfT
hANDLE
LIfT
hANDLE
(2) SPACERS
(2) 1/4”-20
hEX NuT
(2) 1/4” X 2-1/2”
CARRIAGE BOLTS
4”
MAX.
8” MAX.
Vertically
aligned