Broadband Analyzer/Generator
ANT-20/ANT-20E
A-2
Application Guide
Fig. A-3
“Add & Remove Instruments” dialog after adding the desired virtual instruments
(Preselection: ATM Advanced)
1.2
Starting and Stopping the Measurement
✓
Before starting the measurement, the traffic button in the Application Manager is set to
“green”.
Starting the measurement
⇒
Click on the traffic signal button.
– The measurement will be carried out with the parameters, set in the “Measurement
Settings” dialog (Application manager)
– The traffic button display will change from “green” to “red”
– The status display will change from <Stopped> to <Running>.
– The measurement will be stopped automatically after the Gate time run down.
A measurement can also be stopped manually.
Stopping a measurement manually
⇒
Click on the traffic signal button again.
The measurement will be stopped.
Summary of Contents for ANT-20
Page 8: ...Broadband Analyzer Generator ANT 20 ANT 20E vi Notes ...
Page 64: ...Broadband Analyzer Generator ANT 20 ANT 20E O 46 Operation Notes ...
Page 110: ...Broadband Analyzer Generator ANT 20 ANT 20E TB 16 Technical Background Notes ...
Page 126: ...Broadband Analyzer Generator ANT 20 ANT 20E iv Notes ...