background image

Page 13

 

Clean filter housings (bowls) with a mild soap solution and rinse with 

water.  Check O-rings and lubricate with water soluble lubricant. 

KY 

Jelly

®

 or other water based lubricants may be used.  Petroleum based 

lubricants (such as Vaseline

®

must not be used.

For more leverage you may leave the RO module attached to wall of 

cabinet.  If you are unable to access the module while it hangs, remove 

it prior to changing filters. Starting with the closest housing

(Stage 1), remove it by turning it clockwise, empty water, then discard 

filter.  Continue on to the 2

nd 

housing (Stage 2). 

Insert the new sediment filter (cloth like appearance) into the 1st filter 

housing which is the one closest to the side with tubing connections 

and re-install housing.

6 Month System Maintenance

Turn off the incoming water supply to the RO at the adapt-a-valve. 

(Follow the green tube away from the RO system to find the adapt-

a-valve.)

Step 1     

Step 3

Step 4

Step 5

Step 6

Let system sit for a few minutes after tank is empty to depressurize 

before attempting to remove filter housings.   

Open the RO Faucet and allow water to drain from the tank until it 

is completely empty.

Insert the new Carbon Block filter (White End Caps) into the middle 

housing and re-install housing.    

Step 7

Step 2

Step 8 

*Order filters by calling 1-800-752-5582 or buy online at www.premierH2o.com.

√ 

Stage 1 - Sediment Filter (part #: 104017) 

√ 

Stage 2 - Carbon Block Filter (part #: 101009-White End Caps)

Turn water on to the unit at the adapt-a-valve.

Note:

Water Can be saved in a container for drinking or to rinse 
system parts.

Before re-installing the filter bowls back on to the system , 

check O-rings to make sure they are still in place.

Caution:     

Open the RO faucet and leave it open until water begins to trickle out 

(it will come out slowly).

Step 10

Step 9

Close the RO faucet allowing the storage tank to fill with water.

  It 

may take 3 to 6 hours to fill the tank completely depending on the 

production capability of the membrane, local water temperature and 

water pressure. 

** To reset the electronic monitor during replacement of filters, slide out the battery from the 

base of the faucet, wait one minute and reinsert.

Note:

MAINTENANCE & TROUBLESHOOTING

Summary of Contents for Premier WP4V-50

Page 1: ...installation Your failure to follow any attached instructions or operating parameters may lead to the product s failure Watts Premier 8716 W Ludlow Drive Suite 1 Peoria AZ 85381 Phone 800 752 5582 www...

Page 2: ...RO membrane This semi permeable membrane will take out TDS Sodium and a wide range of contaminants such as Chromium Arsenic Copper Lead as well as Cysts such as Giardia and Cryptosporidium and much m...

Page 3: ...Installation 10 Drain Saddle Tube Connection 10 Reverse Osmosis Module Mounting 11 Green Tube Connection 11 Tank Elbow Installation 11 Connect Blue Tube from TANK Port on RO Module to the Tank 11 Con...

Page 4: ...Operating Pressure Maximum 100 psi 7 0 kg cm2 Minimum 40 psi 2 80 kg cm2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity 5 NTU Hardness Maximum 1...

Page 5: ...1 104017 Sediment Filter 10 Inch 5M 4 ALT 1 560016 RO Membrane 35GPD 4 1 560018 RO Membrane 50GPD 5 3 113018 Filter Bowl 6 1 113035 Membrane Vessel 7 3 113041 O Ring Filter Bowl 8 1 113045 O Ring Mem...

Page 6: ...hen drilling Watts accepts no responsibility for damage resulting from the installation of faucet Diamond tip bit recommended Marble Counter top We recommend contacting a qualified contractor for dril...

Page 7: ...b and Install Spout Figure C This RO faucet is equipped with quick connect fittings for easy tube installation To connect tubes simply push them firmly into their corresponding fitting on the RO fauce...

Page 8: ...ur faucet will have a good seal Disassembling your faucet is never recommended as this could void your warranty If it is necessary to remove the fitting at the end of the toggle bolt you must follow t...

Page 9: ...Hot water will severely damage your system 3 8 Configuration With Brass Fittings Insert White Washer 1 2 Configuration Without Brass Fittings White Washer Hot Supply Cold Supply Hot Supply Cold Supply...

Page 10: ...e second drain Installation of the drain saddle near a garbage disposal may cause the drain line to plug If no other installation of drain line is available Premier offers drain line installation kit...

Page 11: ...quick connect fitting on the RO Manifold Make sure the tube is pushed in all the way to the tube stop See Picture Connect red faucet tube Green Tube Connection Step 14 Locate green tube attached to t...

Page 12: ...aucet to flush the tank completely You will know that the tank is empty when the flow rate from the RO faucet is down to a trickle Repeat this step two more times The fourth tank can be used for drink...

Page 13: ...pty to depressurize before attempting to remove filter housings Open the RO Faucet and allow water to drain from the tank until it is completely empty Insert the new Carbon Block filter White End Caps...

Page 14: ...inutes then continue rinsing eye Call a poison control center or doctor for treatment advice Step 4 With the RO faucet in the closed position turn on the incoming water supply to the system by turning...

Page 15: ...ntil it stops Follow the green tube away from the RO system to find the adapt a valve Step 2 Open the RO Faucet and allow water to drain from the tank until it is completely empty Step 3 Remove the ho...

Page 16: ...uge is recommended Check Air Pressure in the Tank Important Step 3 Check air pressure only when tank is empty of water Step 1 Turn off the incoming water supply to the RO Open the RO Faucet and allow...

Page 17: ...or drain Air gap faucet Inherent sound with air gap faucets Location of drain saddle See diagram for proper location of drain saddle Higher capacity membrane Normal with high capacity membrane High wa...

Page 18: ...omplete list of VOC s Recovery 13 7 Daily Production Rate 9 86 GPD Efficiency 6 8 Depending on water chemistry water temperature and water pressure Premier s R O Systems production and performance wil...

Page 19: ...ne where it does convert trivalent arsenic to pentavalent arsenic may not convert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water utility contact the util...

Page 20: ...ONITRILE 98 0 024 0 0006 DICHLOROACETONITRILE 98 0 0096 0 0002 TRICHLOROACETONITRILE 98 0 015 0 0003 HALOKETONES HK 1 1 DICHLORO 2 PROPANONE 99 0 0072 0 0001 1 1 1 TRICHLORO 2 PROPANONE 96 0 0082 0 00...

Page 21: ...urchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6 months 4th stage VOC Block 1 year 3rd...

Page 22: ...exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do not use with water that is micro biologically unsafe or of unknown quality without 9 adequate disinf...

Reviews: