background image

Page 6

 

After drilling, remove all sharp edges and make sure the surroundings 

of the sink are cooled before mounting  the faucet.

Step 3

Step 4

Determine desired  location  for  the RO faucet on your sink and place 

a piece of masking tape over where the hole is  to be drilled.  Mark the 

center of the hole on the tape.

Step 1

Using a variable speed drill set on the slowest speed, drill a 1/8“ pilot 

hole through both porcelain and metal casing of sink at the marked 

center of  the desired location. Use lubricating oil or liquid soap to keep 

the drill bit  cool (If drill bit gets hot it may cause the porcelain to crack 

or chip). 
Using a 1 

¼

” diamond tip hole saw, proceed to drill the large hole.  Keep 

drill speed on  the  slowest speed and use lubricating oil or liquid soap 

to keep the hole saw cool during cutting.

Step 2

Counter Top / Porcelain & Stainless Steel Sink

Note:

Most sinks are pre drilled with 1 ¼” diameter hole that you can use for your RO faucet. 
(If you are already using it for a sprayer or soap  dispenser, see step 1)

Porcelain sinks are extremely hard and can crack or chip easily.  
Use extreme caution when drilling.  Watts  accepts no responsibility for 
damage resulting from the installation of faucet. Diamond tip bit recommended.

Marble Counter-top

We recommend contacting a qualified contractor for drilling a hole in a 

marble counter-top.

Drill a Hole for the Reverse Osmosis Faucet

How to use the Quick Connect Fittings

To make a connection, the tube is simply pushed into the fitting.  The unique locking system holds the tube firmly in place 

without deforming it or restricting flow. Use the steps below in reference to any quick connect tube connections.

It is essential that the outside diameter be free of score 

marks and that burrs and sharp edges be removed before 

inserting into fitting.

Fitting  grips  before  it  seals.    Ensure  tube  is  pushed  into 

the tube stop.

Push the tube into the fitting, to the tube stop.  The collet 
(gripper)  has  stainless  steel  teeth  which  hold  the  tube 
firmly in position while the O-ring provides a permanent 
leak proof seal.

Pull on the tube to check that it is secure.  It is a good practice 
to test the system prior to leaving site and /or before use.

To disconnect, ensure the system is 

depressurized before removing the tube.  Push in the col

-

lect  squarely  against  face  of  fitting.    With  the  collet  held 
in this position, the tube can be removed.  The fitting can 

then be reused.

Summary of Contents for Premier WP4V-50

Page 1: ...installation Your failure to follow any attached instructions or operating parameters may lead to the product s failure Watts Premier 8716 W Ludlow Drive Suite 1 Peoria AZ 85381 Phone 800 752 5582 www...

Page 2: ...RO membrane This semi permeable membrane will take out TDS Sodium and a wide range of contaminants such as Chromium Arsenic Copper Lead as well as Cysts such as Giardia and Cryptosporidium and much m...

Page 3: ...Installation 10 Drain Saddle Tube Connection 10 Reverse Osmosis Module Mounting 11 Green Tube Connection 11 Tank Elbow Installation 11 Connect Blue Tube from TANK Port on RO Module to the Tank 11 Con...

Page 4: ...Operating Pressure Maximum 100 psi 7 0 kg cm2 Minimum 40 psi 2 80 kg cm2 pH Parameters Maximum 11 Minimum 2 Iron Maximum 0 2 ppm TDS Total Dissolved Solids 1800 ppm Turbidity 5 NTU Hardness Maximum 1...

Page 5: ...1 104017 Sediment Filter 10 Inch 5M 4 ALT 1 560016 RO Membrane 35GPD 4 1 560018 RO Membrane 50GPD 5 3 113018 Filter Bowl 6 1 113035 Membrane Vessel 7 3 113041 O Ring Filter Bowl 8 1 113045 O Ring Mem...

Page 6: ...hen drilling Watts accepts no responsibility for damage resulting from the installation of faucet Diamond tip bit recommended Marble Counter top We recommend contacting a qualified contractor for dril...

Page 7: ...b and Install Spout Figure C This RO faucet is equipped with quick connect fittings for easy tube installation To connect tubes simply push them firmly into their corresponding fitting on the RO fauce...

Page 8: ...ur faucet will have a good seal Disassembling your faucet is never recommended as this could void your warranty If it is necessary to remove the fitting at the end of the toggle bolt you must follow t...

Page 9: ...Hot water will severely damage your system 3 8 Configuration With Brass Fittings Insert White Washer 1 2 Configuration Without Brass Fittings White Washer Hot Supply Cold Supply Hot Supply Cold Supply...

Page 10: ...e second drain Installation of the drain saddle near a garbage disposal may cause the drain line to plug If no other installation of drain line is available Premier offers drain line installation kit...

Page 11: ...quick connect fitting on the RO Manifold Make sure the tube is pushed in all the way to the tube stop See Picture Connect red faucet tube Green Tube Connection Step 14 Locate green tube attached to t...

Page 12: ...aucet to flush the tank completely You will know that the tank is empty when the flow rate from the RO faucet is down to a trickle Repeat this step two more times The fourth tank can be used for drink...

Page 13: ...pty to depressurize before attempting to remove filter housings Open the RO Faucet and allow water to drain from the tank until it is completely empty Insert the new Carbon Block filter White End Caps...

Page 14: ...inutes then continue rinsing eye Call a poison control center or doctor for treatment advice Step 4 With the RO faucet in the closed position turn on the incoming water supply to the system by turning...

Page 15: ...ntil it stops Follow the green tube away from the RO system to find the adapt a valve Step 2 Open the RO Faucet and allow water to drain from the tank until it is completely empty Step 3 Remove the ho...

Page 16: ...uge is recommended Check Air Pressure in the Tank Important Step 3 Check air pressure only when tank is empty of water Step 1 Turn off the incoming water supply to the RO Open the RO Faucet and allow...

Page 17: ...or drain Air gap faucet Inherent sound with air gap faucets Location of drain saddle See diagram for proper location of drain saddle Higher capacity membrane Normal with high capacity membrane High wa...

Page 18: ...omplete list of VOC s Recovery 13 7 Daily Production Rate 9 86 GPD Efficiency 6 8 Depending on water chemistry water temperature and water pressure Premier s R O Systems production and performance wil...

Page 19: ...ne where it does convert trivalent arsenic to pentavalent arsenic may not convert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water utility contact the util...

Page 20: ...ONITRILE 98 0 024 0 0006 DICHLOROACETONITRILE 98 0 0096 0 0002 TRICHLOROACETONITRILE 98 0 015 0 0003 HALOKETONES HK 1 1 DICHLORO 2 PROPANONE 99 0 0072 0 0001 1 1 1 TRICHLORO 2 PROPANONE 96 0 0082 0 00...

Page 21: ...urchase __________ Date of Install ___________ Installed by __________________ Serial No _____________________ Date 1st stage Sediment 6 months 2nd stage Carbon 6 months 4th stage VOC Block 1 year 3rd...

Page 22: ...exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do not use with water that is micro biologically unsafe or of unknown quality without 9 adequate disinf...

Reviews: