Lync WQ-SF
SECTION 2: Installation and Operation
L- OMM-004_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
8
of
54
2.
Installation and Operation
2.1.
Pre-Installation Considerations
Unpack the crate(s) and pallets and make sure all components are accounted for according to
the table below for each specific model. If any components are missing or damaged contact
your Lync representative. If they cannot be reached contact Lync customer service at
Component
Shipped
Loose
Pre-
installed
Quantity
WQSF-
025-N
WQSF-
050-N
WQSF-
075-N
WQSF-
100-N
Water Softener Tanks
X
2
2
4
4
FLECK® Control Valves
*
X
2
2
4
4
Drain Line Flow Control (DLFC)
Valves
X
2
2
4
4
Flow Meter(s)
X
1
1
4
4
Assembled
2” Inlet Piping Header(s)
X
1
1
2
2
Assembled
2” Outlet Piping Header(s)
X
1
1
2
2
Assembled
1” Drain Piping Header(s)
X
1
1
2
2
2” Gasket/Bolt kit(s)
X
-
-
2
2
1” Gasket/Bolt kit(s)
X
-
-
1
1
Unistrut Channels Package
X
1
1
1
1
Piping Clamps and Victaulic
Couplings Package
X
1
1
1
1
Control Valve Transformer
X
2
2
4
4
Flowmeter Cable
X
1
1
4
4
CAT5 Communication Cable
X
1
1
3
3
Resin Bags
**
X
10
14
20
28
Gravel Support Media bags
**
X
4
4
8
8
Brine tanks
X
1
1
4
4
10ft Brine Solution Tube(s)
X
3
3
4
4
10ft Brine Overflow Tube(s)
X
1
1
4
4
TEE Fitting for Brine Solution Tubes
X
1
1
-
-
* All control valves are installed loose and threaded onto the water softener tank. Be careful
during uncrating and installation process to avoid any damage to the system components.
** Resin and gravel are supplied in bulk on pallets. The proper amount is supplied for the
system. Divide resin and gravel equally between the number of mineral tanks.
•
Make sure that the installation location of the skid and brine tanks is smooth, level, and
sturdy enough to support the weight of the system once it is in operation.
•
The softener should be located close to a drain. It is recommended to install the system
no more than 10 ft away from a drain that can handle high flow rate backwash load.