
T-365
Page 45 of 75
Reassembly - Attach Cap to Case (Continued)
TC20B Models
TC20C Models
TC20D, TC20E and TC20F Models
Install ten (10) 1/2-13 screws (refer to service parts list for size
and installation for each PTO model - varies by model and
ratio).
Torque as follows:
·
Screws in Tapped Holes: 75 lb-ft.
·
Bolt and Nut: 85 lb-ft.
Install ten (10) 1/2-13 screws (refer to service parts list for size
and installation for each PTO model - varies by model and
ratio).
Torque as follows:
·
Screws in Tapped Holes: 75 lb-ft.
·
Bolt and Nut: 85 lb-ft.
Cap
Shim
Install two (2) dowel pins if they were removed dur
ing disassembly.
Case
Cap
Install two (2) dowel pins if they were removed dur
ing disassembly.
Shim
Install shims if ne
cessary (refer to
service parts list
for quantity and
thickness of shims
for each PTO
model - varies by
model and ratio.)
Install shims if
necessary (refer
to service parts
list for quantity
and thickness of
shims for each
PTO model - var
ies by model and
ratio.)
Install ten (10) 1/2-13 screws (refer to service parts list for
size and installation for each PTO model - varies by model
and ratio).
Torque as follows:
·
Screws in Tapped Holes: 75 lb-ft.
·
Bolt and Nut: 85 lb-ft.
Install two (2)
dowel pins if
they were re
moved during
disassembly.
Shim
Cap
Install shims if
necessary (refer
to service parts
list for quantity
and thickness of
shims for each
PTO model -
varies by model
and ratio.)
Case
Case