CK and EQ Manual
Page 13
OEM Softener System Setup
In OEM Softener System Setup the OEM chooses the time for the cycles selected in OEM Cycle Sequence and specifies other
operating parameters for the system. The upper and lower limits of the allowable values for the cycles are as follows:
If an upflow control valve is programmed for prefill the proportional brining display will appear after the system capacity display
(Step 7S).
Cycle Options
Units
Lower/Upper Limit
Backwash
Minutes
1 to 120
Rinse (fast)
Minutes
1 to 120
Regenerant DRAW DN (combination of brining and slow rinse) Minutes
1 to 180
Regenerant DRAW UP (combination of brining and slow rinse) Minutes
1 to 180
Fill for all valves except WS2
Kg
0.05 to 100
Fill for WS2 valves or WS1.5 set to “MIN”
Minutes
0.1 to 99
Service
Minutes
1 to 480
STEP 1S
Step 1S – Press NEXT and
▼
simultaneously for 3 seconds and release. If screen in Step 2S does not
appear in 5 seconds the lock on the valve is activated. To unlock press
▼
, NEXT,
▲
, and CLOCK in
sequence, then press NEXT and
▼
simultaneously for 3 seconds and release.
STEP 2S
Step 2S – Choose SOFTENING using
▲
or
▼
. Press NEXT to go to Step 3S. Press REGEN to exit
OEM Softener System Setup.
STEP 3S
Step 3S – Select the time for the first cycle (which in this example is BACKWASH) using
▲
or
▼
.
Press NEXT to go to Step 4S. Press REGEN to return to previous step.
STEP 4S
Step 4S – Select the time for the second cycle (which in this example is DRAW) using
▲
or
▼
. Press
NEXT to go to Step 5S. Press REGEN to return to previous step.
STEP 5S
Step 5S – Select the time for the third cycle (which in this example is RINSE) using
▲
or
▼
. Press
NEXT to go to Step 6S. Press REGEN to return to previous step.
Since no time is associated with the END cycle, the END cycle will not appear in the OEM Softener System Setup sequence.