14
Installation
7
8
9
1757
1758
1759
Mechanical installation
•
Place wide steel shims on the concrete
foundation over the bolts.
•
Lift the machine and lower it in position. Never
use the door or the door handle to lift or lower
the machine.
•
Check that the machine is level front-to-rear
and side-to-side and standing firmly on the ten
supporting points. Spacing washers must be
mounted if one or more of these points is not
resting against the floor/foundation.
•
Place flat washers over the foundation bolts
and secure the machine in position by
tightening the self-locking nuts. See illustration
below.
•
Tighten the nuts in sequence as shown.
•
Check and tighten the nuts every week for the
first month.
Fig.
7
Fig.
8
Fig.
9
Fig.
10
2408
10
EXSM 230 S
EXSM 350 S
2399
Summary of Contents for EXSM 230 S
Page 4: ......
Page 6: ......
Page 32: ...32 Mechanical and electrical design Control unit ...
Page 93: ...93 Trouble shooting If machine vibrates excessively A Tighten mounting bolts Fig 101 101 2408 ...
Page 94: ......
Page 123: ......