6
Warner Electric • 800-825-9050
P-0204-WE • 819-0485
PB-500 Primary Brake Heavy
Duty Pin Drive Armature
Installation Instructions
A. Installing the Conduit Box
Please follow instructions supplied with conduit box .
B. Mounting the Magnet
The brake magnet is mounted to a stationary machine
member by a flange . Extreme care must be taken in
selecting the location for the mounting of the magnet .
Proper positioning is very important for the unit to function
correctly .
1 . A pilot diameter on the mounting surface is essential
to hold the magnet within the required tolerances .
(Figure 1)
2 . A machined pilot diameter is provided on the magnet
mounting flange (refer to illustrations) to aid in the
proper positioning of the magnet .
3 . Once the mounting surface has been prepared,
the magnet is bolted in place with capscrews and
lock-washers . (Figure 2)
Figure 1
Figure 2
Figure 3
4 . Use a dial indicator to check the unit for concentric-
ity and squareness to the shaft . The unit should be
concentric within .010 T .I .R . and square within .006
T .I .R . (Figure 3)
Send Quote Requests to [email protected]
Call +1(800)985-6929 To Order or Order Online At Warnerelectricparts.com
Send Quote Requests to [email protected]
Call +1(800)985-6929 To Order or Order Online At Warnerelectricparts.com