Householder Information
IMPORTANT!
Your boiler must be commissioned in order to:
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
The “Benchmark” and warranty registration document at the end of this manual
should be completed as
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a
further 3 year
warranty of the heat exchanger – a total of 5 years.
Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
service department
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
3
Standard X-ternal & System X-ternal
Handbook
Householder Information
IMPORTANT!
Your boiler must be commissioned in order to:
-
Validate your warranty
-
Ensure the boiler has been installed correctly and avoid premature failure
-
Set the boiler to its optimum efficiency. Operating conditions for the boiler will vary from site to site, your
commissioning engineer has specialised equipment to check the oil pressure and analyse the exhaust gases for
temperature, smoke and carbon dioxide content.
Your installer will organise the commissioning of your boiler. Should you experience any difficulty locating an
engineer, our service department may be able to provide you with details of an engineer in your area.
“Benchmark” Installation, Commissioning and Service Record Log Book
Please ensure that your installer has completed all sections of the log book (found at the back of this manual).
The log book will be required in the event of any warranty work. Ensure that the service record is completed.
Warranty
Your HRM boiler is under warranty for 2 years from the date of installation.
Warranty Conditions
-
The boiler must be installed and commissioned in accordance with our handbook
-
The boiler must not be repaired, modified or tampered with by any person not authorised by HRM
Extended Warranty
The “Benchmark” and warranty registration document at the end of this manual
should be completed as
appropriate by your installer / engineer. This is your record that the boiler has been correctly installed in accordance
with our recommendations. Return the warranty registration document to HRM in order to qualify for a
further 3 year
warranty of the heat exchanger – a total of 5 years.
Extended Warranty Conditions
-
The boiler must be serviced annually and maintained in accordance with this handbook. The
“Benchmark” service log is located at the back of this manual
-
This warranty is in addition to your statutory and other legal rights
After Sales Service
-
If your boiler fails during the warranty period contact your installer, who will be able to identify the
cause of the problem. If appropriate, your installer will contact us.
-
Under no circumstances should “in warranty” work be undertaken without authorisation from the HRM
service department
-
If you are unable to contact your installer please contact our service department. Quoting your boiler’s
serial number when phoning – this can be found on the cover of this manual.
3
Standard X-ternal & System X-ternal
Handbook
35
34
Contents Page
DESCRIPTION
PAGE
Householder Information
Warranty Registration Document
End Of Manual
Warranty
3
Extended
Warranty
3
After
Sales
Service
3
Boiler
Controls:
Wallstar 4
System
Wallstar 5
Wallstar
Combi
6-7
Burner
Lockout
8
Technical Specifications
Boiler
Dimensions:
Wallstar
9
Boiler
Dimensions:
System
Wallstar
10
Boiler
Dimensions:
Wallstar
Combi
11
Technical
Specifications
12
Burner
Settings
13
Boiler Installation
Regulations
14
Boiler
Sizing
14
Refurbishing
An
Old
System
14
System
Protection
14
Boiler
Location
15
Wall
Construction
15
Flue
Terminating
Positions
16
Fuel
Supply
System
17
Oil
Supply
17
Installation Procedure
Wallstar 18-23
System
Wallstar 24-31
Wallstar
Combi
32-40
Condensate
Drain
41
Wiring Diagrams
Wallstar 42
System
Wallstar 42
Wallstar
Combi
43
Boiler Maintenance
Baffle
Removal
44
Fault Diagnosis
Wallstar
Combi
45
Wallstar
Combi
Components
46
Contacts
Tel No: 01953 455400
Fax No: 01953 454483
Email:
or
1
Standard Wallstar, System Wallstar &
Wallstar Combi Manual
Contents Page
DESCRIPTION
PAGE
Householder Information
Warranty Registration Document
End Of Manual
Warranty
3
Extended
Warranty
3
After
Sales
Service
3
Boiler
Controls:
Wallstar 4
System
Wallstar 5
Wallstar
Combi
6-7
Burner
Lockout
8
Technical Specifications
Boiler
Dimensions:
Wallstar
9
Boiler
Dimensions:
System
Wallstar
10
Boiler
Dimensions:
Wallstar
Combi
11
Technical
Specifications
12
Burner
Settings
13
Boiler Installation
Regulations
14
Boiler
Sizing
14
Refurbishing
An
Old
System
14
System
Protection
14
Boiler
Location
15
Wall
Construction
15
Flue
Terminating
Positions
16
Fuel
Supply
System
17
Oil
Supply
17
Installation Procedure
Wallstar 18-23
System
Wallstar 24-31
Wallstar
Combi
32-40
Condensate
Drain
41
Wiring Diagrams
Wallstar 42
System
Wallstar 42
Wallstar
Combi
43
Boiler Maintenance
Baffle
Removal
44
Fault Diagnosis
Wallstar
Combi
45
Wallstar
Combi
Components
46
Contacts
Tel No: 01953 455400
Fax No: 01953 454483
Email:
or
1
Standard Wallstar, System Wallstar &
Wallstar Combi Manual
Installation Procedure Continued – Wallstar Combi
8. Tundish Installation
The flow from the pressure relief valve should be plumbed away.
A Tundish must be installed in accordance with Building
Regulations: G3.
9. Filling The System
Ensure the automatic air vent on top of the heat exchanger
is functioning correctly.
Open the filling loop valve and pressurise the system until 1
bar is showing on the pressure gauge. It may be necessary
after venting air from the heating system, to repeat this
operation in order to fill the system correctly.
10. Fit The White Casing
The casing is supplied pre-assembled. Remove the front cover
first, then the top panel and then the bottom panel which has the
control panel assembly attached to it.
11. Side Panels
Locate the side panels by hooking the slots over the screws
located in the wall plate. Tighten to secure.
34
Standard Wallstar, System Wallstar &
Wallstar Combi Manual
Installation Procedure Continued – Wallstar Combi
12. Top Panel
Slide the white case top panel under the returns on the two side
panels until it rests on the supports at the back. Secure the top to
the sides with the screws provided.
13. Bottom Panel & Control Panel
Slide the bottom panel, with the control panel assembly still
attached inside the white case. Align the screws on the
bottom panel up with the slots on the base of the side
panels and drop them through, slide the bottom panel back
and tighten the screws. Leave the control panel in the
forward position.
14. Mains Supply
A switched 13amp socket should be installed near the boiler.
The boiler is supplied with a 13amp plug (fused at 5amps) with a
1.5 metre lead.
For concealed cable entry, 20mm holes are provided in the wall
plate, alternatively use plastic ducting to any corner of the wall
plate.
15. Burner Lead
Pass the burner lead which is attached to the control panel
through the rectangular opening in the wall plate and secure
the switch panel. Ensure the switch plate gasket is in
position.
35
Standard Wallstar, System Wallstar &
Wallstar Combi Manual
A switched 13amp socket should be installed near the boiler.
The boiler is supplied with a plug (fused at 5amps) with a
1.5 metre lead.