![wallas SVB 90 Installation, Operation And Service Instructions Download Page 42](http://html1.mh-extra.com/html/wallas/svb-90/svb-90_installation-operation-and-service-instructions_3232541042.webp)
90
490120A
K00007
Stove installation
Saw a cut-out (see picture) for the stove and the control panel in your chosen loca-
tion.
The length of the control panel cable is 2 m.
GB
Installation
The stove requires a replacement
air opening of at least 100 cm
2
.
Ensure that the air circulation under
the stove is suffi cient
Ensure that there is suf-
fi cient space under the
stove for cables and hoses.
The control panel should
be installed on a vertical
surface.
You can also fabricate a
detachable panel to go in
front of the stove. This will
facilitate installation and
maintenance.
90.indd 5
20.01.2010 14:49:01
- 42 -