
SPEEDGATE Installation and Maintenance Manual
Revision 1 - MAY 2023
47
SPEEDGATE INSTALLATION
5. Ensure minimum of 4” (10cm) thread exposed above foundation. See chemical anchor installation
guide accompanying the product for depth of anchor holes. HILTI anchors and epoxy are available
from Wallace Perimeter Security.
The installer shall read and follow the manufacturer’s written instructions for HILTI HVU2 1” X 8 1/4”
accompanying the shipped adhesive capsule product. Refer to step-by-step diagram on the following
pages, summarized below.
SUMMARY OF DIAGRAM STEPS 1 TO 11:
STEPS 1, 2, 3
As indicated in diagram on following pages. (Place each steel anchor bolt template on
the prepared, leveled foundations and center the conduits.)
STEP 4
On both concrete piles:
Drill two (non-corner) 1/2” by 2 3/4” deep holes directly opposite one another into
the pre-drilled steel anchor bolt template.
STEP 5
On both concrete piles:
Insert two wedge anchors into the 1/2” by 2 3/4” deep holes.
STEP 6
On both concrete piles:
In the four corners of each pre-drilled steel anchor bolt template, drill 1 1/8” by 9”
deep holes.
STEP 7
On both concrete piles:
Use a hand-operated air pump in combination with a hole-cleaning brush to clean
debris and dust from each of the drill holes prior to anchor installation.
On both concrete piles:
Check the setting depth in each of the 1 1/8” by 9” deep (four-corner) hammer-drilled
holes.
Ensure minimum of 4” (10cm) thread is exposed above the foundation.
STEP 8
On both concrete piles:
Insert the HILTI foil (mortar) capsule with the peak ahead (tapered end) to the back
of the hole.
STEP 9
Using 1” grade 8 anchor bolts (or equivalent), embed the anchors; drive with plugged
tool into the hole(s). A nut and washer shall be tightened on each anchor bolt.
STEP 10, 11
8 ¼” is the minimum depth for driving the anchor into the hole. Refer to manufacturer’s
instructions for appropriate curing time.
Summary of Contents for SPEEDGATE
Page 48: ...48 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Page 52: ...52 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Page 59: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 1...
Page 60: ......
Page 61: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 2...
Page 62: ......
Page 63: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 3...
Page 64: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 141: ......