130
wallaceperimetersecurity.com
Phone: 866.300.1110
Periodic Maintenance to the Entire Installation: Weekly,
Quarterly, Semi-Annually, General (Repair and Additional)
Maintenance is essential in order to guarantee the safety and the satisfactory operation of the SpeedGate.
Maintenance checks should be conducted only by qualified maintenance personnel. The following
maintenance interval checklists are provided to record repair requirements, maintenance performed and
additional observations pertinent to the SpeedGate. Checklists must be dated, signed and retained for
record-keeping purposes.
Turn OFF power to the gate whenever assembly and maintenance activities
are being carried out.
After turning off the controller, dangerous voltage levels remain present
for up to 5 minutes. Touching electronic components is dangerous due to
residual voltages. Never operate the controller while the cover is removed.
SpeedGate Weekly Maintenance Checklist
1-SPEEDGATE WEEKLY MAINTENANCE CHECKLIST
Checked
Good
Needs
Attention
N/A
SpeedGate Serial Number:
To be carried out by end user the first workday of every week:
1. Perform a general visual inspection.
2. Check that lighting at the SpeedGate site is in good
working order.
3. Check that the SpeedGate is in good working order,
in conformance with UL standards. Test the Gate
System. The gate MUST react as programmed
(e.g., stop/reverse on contact with a rigid object).
The gate MUST react as programmed (e.g., stop/
reverse when an object breaks the photo eye
infrared beam) while the gate is in the Closing
cycle. Failure to properly test inherent and external
entrapment devices on a weekly basis can increase
the risk of injury or death.
4. Check that the Reduced Speed/Torque Change
Sensor (the inherent entrapment sensor) is in good
working order.
PERIODIC MAINTENANCE TO THE ENTIRE INSTALLATION: WEEKLY, QUARTERLY, SEMI-ANNUALLY, GENERAL (RE-
Summary of Contents for SPEEDGATE
Page 48: ...48 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Page 52: ...52 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Page 59: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 1...
Page 60: ......
Page 61: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 2...
Page 62: ......
Page 63: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 3...
Page 64: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 141: ......