Operation
5.8
Before Starting
Before putting the Light Tower into service, review each item on the following
checklist. Light Towers often run unattended for long periods of time. Therefore, it
is important to make sure that the machine is set up properly to avoid possible
operating problems.
Check
machine
condition
Verify that the machine is level and positioned on a stable surface.
Perform a walk-around to check for visible damage.
Inspect the lights and lamps: ensure that glass is not broken or cracked.
Ensure that all electrical connections are tight.
Verify that all electrical cords are in serviceable condition with no exposed wires,
cuts, or cracks in the insulation.
Close and secure access covers before starting the machine.
Check the
engine
Check fuel, engine oil, and coolant levels. Add fluids if necessary.
Verify that the air filter element is clean and undamaged. Replace if necessary.
Check to make sure no debris has lodged in vents, near the radiator, or around
the fan.
Check to make sure that the exhaust compartment is clean and nothing is
touching the muffler or exhaust pipes.
Check fan belt and hoses on engine for loose connections or fraying. Tighten or
replace as required.
Review safety
information
Review and follow instructions provided in the “Safety Information” chapter at
the beginning of this Operator’s Manual.
CAUTION
Improper machine setup may cause injury or equipment damage.
►
Perform all pre-start checks listed below. Do not operate the machine until all
items on the checklist have been addressed.
Summary of Contents for LTV6K
Page 8: ...Table of Contents LTV wc_bo5100030216_02_FM10TOC fm 8...
Page 21: ...wc_si001039gb_FM10 fm 21 LTV Labels wc_gr013743 W W V T U Q S...
Page 108: ......
Page 110: ......