![Wacker Neuson LTV6K Operator'S Manual Download Page 32](http://html1.mh-extra.com/html/wacker-neuson/ltv6k/ltv6k_operators-manual_866644032.webp)
wc_tx004429gb_FM10.fm
32
Lifting and Transporting
LTV
3.3
Before Towing Checklist
For trailer machines only.
Before towing the machine, check the licensing requirements for trailers in your
area. Check the following items:
Machine
All doors and access panels of the machine are closed.
All electrical connections are disconnected from the machine.
The generator is shut down.
The tower is completely lowered.
The outriggers are in the travel position.
The outrigger bars and jacks are locked in place.
The tongue jack is in the travel position.
Hitch and coupler
The towing vehicle and hitch have a rating equal to or greater than the GVWR of
the machine. See
Technical Data
.
The hitch of the towing vehicle and coupler of the trailer are compatible.
The condition of both the coupler and the hitch.
That all fasteners on the coupler are secure.
That the coupler has fresh grease applied to it.
Wheels
That all lug nuts are in place and are properly torqued.
The tread wear of the tires.
That the tires are inflated to the proper pressure.
Trailer operation
The directional and running lights on the trailer function correctly.
The safety chains of the trailer are connected to the towing vehicle using a
crisscross pattern.
Summary of Contents for LTV6K
Page 8: ...Table of Contents LTV wc_bo5100030216_02_FM10TOC fm 8...
Page 21: ...wc_si001039gb_FM10 fm 21 LTV Labels wc_gr013743 W W V T U Q S...
Page 108: ......
Page 110: ......